roofing sheet roll forming machine
ltem |
Name |
Description |
1 |
Decoiler |
Capacity:5 tons |
2 |
Material |
Steel Coil |
3 |
Thickness |
0.3-0.8mm |
4 |
Transmission |
Chain/Gear/Gearbox |
5 |
Speed |
15m/min |
6 |
Roller |
40Cr Steel with quenched treatment,chromed on the surface |
7 |
Shaft |
steel with tempering treatment |
8 |
Cutting type |
Hydraulic cutting |
9 |
Cutting material |
Cr12 with quenched treatment Hardness58°-62° |
10 |
Welding |
Automatic spot welding |
11 |
Control system |
PLC |
12 |
Electric brand |
Delta,siemens,Schneide |
13 |
Voltage |
380V,50HZ,3PH(or as customers' request) |
Rollers
Ameco Rollers are custom designed andmachined precisely by state-of-the-art CNCmachines placed inside the factoryRollers are hardened through vacuum heattreatment (Taiwan technology) and chromeplating
Frame
Frame are made by hardened steel andconnected by bolts which make machinerysturdy, easy to maintain, and avoiddeformation while operating
Cutting and embossing
Shearing (Cutting) die set and Embossing dieset are made by s50C or SkD, gone throughvacuum heat treatment to have a longerlifespan.
Control System
Control system with intelligent PLC and HM!
touch-screen helps to operate machinesimply and to create identical rollformed steelsheets which present your exactspecificationsAmeco Vietnam has applied high technologyin machinery such as modern inverter andSenvo to increase speed, operate smoothly!and save energy
1.How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
2. Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
3.How many workers to operate the machine?
A:Only 1-2 workers.
4. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.
5. What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
6.How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.