Customization: | Available |
---|---|
After-sales Service: | Training,Spart Parts,on-Site Service |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Walk Scaffolding Plank Roll Forming Production Line Scaffold Walk Board Making Machine
Scaffold plank roll forming machine can make scaffold plank.
We adopt servo feeder to make sure the holes are in high precision. We use punching press to make line speed faster and we use hydraulic post cutting to make sure the profile perfect.
The thickness of raw material is around 1-2mm.
Scaffold plank Roll Forming Machine |
|||
No. |
Item |
Specification |
Optional |
1 |
Suitable material |
Type:Galvanized Coil, PPGI, Carbon steel Coil |
|
|
|
Thickness(mm):1-2 |
|
|
|
Yield strength: 250 - 550MPa |
|
|
|
Tensil stress( Mpa):G350Mpa-G550Mpa |
|
2 |
Nominal forming speed(m/min) |
10-25 |
Or according to your requirement |
3 |
Forming station |
20 |
|
4 |
Decoiler |
Manual decoiler |
Hydraulic decoiler or double head decoiler |
5 |
Main machine motor |
Sino-German Brand |
Siemens |
6 |
PLC brand |
Panasonic |
Siemens |
7 |
Inverter brand |
Yaskawa |
|
8 |
Driving system |
Chain drive |
Gearbox drive |
9 |
Rollers' materail |
Steel Cr12 |
Chromed treatment, improve the hardness and prevent abrasion, anti corrosion increase service life. |
10 | Shaft | Steel 40Cr | Tempering treatment to prevent deformed and improve hardness |
11 |
Station structure |
Torri stand structure |
Forged Iron station Or Wall panel station
|
12 |
Punching system |
No |
Hydraulic punching station or Punching press |
13 |
Cutting system |
Post-cutting |
Pre-cutting |
14 |
Power supply requirement |
380V 60Hz |
Or according to your requirement |
15 |
Machine color |
Industrial blue |
Or according to your requirement |
Manual decoiler--feeding--hydraulic punching station--forming machine--hydraulic cutting--out table
1.How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.